CHILMAN have recently finished the installation of an Automist Fixed head system for two Tree Houses. This was the third installation CHILMAN have carried out for Bower House Construction.
The System is being used as a fire engineered solution enabling the Tree Houses to be used as holiday accommodation.
CHILMAN Engineer Mark said, “it was a very interesting installation and is a great example of how Automist can be used as a solution to all kinds of building control issues”.